Demarcation of Right of Way (ROW) and Re-Installation of Damaged Markers of Transmission Pipeline in Balochistan, Pakistan through Geomatics Technologies: A Case Study of Zarghun to Quetta High Pressure Natural Gas Supply

Authors

  • Zawwar Hussain University of Karachi, 75270, Karachi, Sindh, Pakistan
  • Syed Ali Asad Naqvi University of Karachi, 75270, Karachi, Sindh, Pakistan
  • Syed Jamil H. Kazmi University of Karachi, 75270, Karachi, Sindh, Pakistan
  • Syed Ali Naqi Sui Southern Gas Company Limited - (SSGC), I.T Department, Head Office, Karachi, 75300, Pakistan
  • Muhammad Haneef Institute of Space Technology, Karachi, Pakistan
  • Farina Zulfi Government Degree Girls Arts & Commerce College, C-1 Area, Malir, Karachi, Sindh, Pakistan

DOI:

https://doi.org/10.6000/1927-5129.2015.11.07

Keywords:

 Geomatics Technologies, Realignment, Land Markers, GPS, ROW, Gas Transmission.

Abstract

The alignment of gas pipelines in a rugged terrain has always been a serious challenge around the globe but they can be perfectly aligned with the help of Geo-Spatial technologies. When South Zarghun gas fields were discovered in Pakistan, gas transmission pipeline laying process between gas fields and Quetta city was as challenging task for the Government of Pakistan. Very rough terrain and extreme weather conditions especially in winter season were the two major constraints for the alignment of pipeline. Geomatics survey was essential before transmission pipeline construction work, done twice by private consultant in Pakistan’s local geographic coordinate system. SSGC took decision in 2006 for the construction of pipeline but unfortunately it could not be executed due to law & order situation in Pakistan especially in Balochistan province and later all bench marks of pipeline alignment route were vanished by the locals. In 2012, SSGC again started pipeline construction work on war steps. Previous pipeline alignment survey was converted into existing SSGC’s GIS coordinate system i.e. UTM Zone 42 WGS84 using ESRI ArcGIS software. Identification & re-installation of all bench marks and re-routing of pipeline were done by SSGC GIS survey team with the help of global positioning system (GPS) and satellite data. Finally, right of way (ROW) of transmission pipeline from Zarghun gas fields to Quetta city was designed and produced in the form of GIS map for pipeline construction activities.

References

Bakar WAWA, Ali R. Introduction, Background. In: Primoz Potocnik, editors. Natural Gas. Sciyo. 2010. Retrieved at 19: 00 on 29 August, 2014, Available from: http://cdn.intechopen. com/pdfs-wm/11439.pdf

Natural gas by country [Online web page

Sui Gas Field [Online web page

Partial flow begins from Zarghun gas field [Online News Article

Mari Petroleum Company Limited [Online

Commercial Production Commences at Zarghun South Gas Field in Pakistan [Online press release

Martin, JC and Bastide. Positioning, Navigation, and Timing for Security and Defense. Handbook of Space Security: Policies, Applications and Programs, 2015; 609-629. Available from: http://link.springer.com/referenceworkentry/ 10.1007/978-1-4614-2029-3_21

Safi GM et al. Agricultural Productivity in Balochistan Province of Pakistan A Geographical Analysis. Journal of Basic & Applied Sciences 2014; 10: 292-298. http://dx.doi.org/10.6000/1927-5129.2014.10.38

Online History Regarding Mari Petroleum Company Limited [Website

SSGC, Annual Report 2012, Sui Southern Gas Company Limited, Karachi, Pakistan 2012.

FLAME, the official Magazine of SSGC FLAME, Sui Southern Gas Company Limited, Karachi, Pakistan 2014; Vol. 79.

OGRA, Operational CNG Stations License List, Oil and Gas Regulatory Authority, Government of Pakistan (OGRA), Islamabad 2012-13.

Trimble Integrates Mobile GIS and High Accuracy GPS [Online News Release

Getting Started Guide, GeoExplorer® CE Series [Device & Software Guide

Downloads

Published

2015-01-05

Issue

Section

Geography

How to Cite

Demarcation of Right of Way (ROW) and Re-Installation of Damaged Markers of Transmission Pipeline in Balochistan, Pakistan through Geomatics Technologies: A Case Study of Zarghun to Quetta High Pressure Natural Gas Supply. (2015). Journal of Basic & Applied Sciences, 11, 52-61. https://doi.org/10.6000/1927-5129.2015.11.07

Similar Articles

1-10 of 126

You may also start an advanced similarity search for this article.